Neighbourhood Plan Online

(1) All development that will generate a significant volume of construction and operational waste will be required to demonstrate through a waste audit statement how the waste will be minimised, and residual waste will be reused or recycled on site, or segregated for reuse and recovery elsewhere in accordance with the waste hierarchy.

(2) Development adjacent to an existing or planned waste management facility will be required to demonstrate that the proposed development does not prevent, hinder or unreasonably restrict the operation of the waste development.

(3) Development that will generate a significant volume of operational waste will be required to demonstrate that its impact on the highway network is not severe and must provide adequate site access for the type and volume of vehicles that will be using the development.

(4) Management of waste from proposed development will be expected to accord with the  Devon Waste Plan.

0
Would love your thoughts, please comment.x
()
x
Skip to content